BESS Engineer (BESS/Renewable Energy/Energy Storage) Duqm, Oman (10 months)

  • Contractual
  • Full-time
  • At least 10 years of experience (Professional)
  • Bachelor degree
  • ENGINEERING SERVICES

" Some imagine the future. At SEGULA, we build it. "


Mission

Location: Duqm, Sultanate of Oman
Mobilization: January 2027
Duration: 10 months
Sector: BESS / Renewable Energy / Energy Storage

About the Role

SEGULA Technologies Middle East is seeking an experienced BESS Engineer to supervise installation, integration, commissioning and performance testing of utility-scale Battery Energy Storage Systems.

Key Responsibilities

  • Supervise BESS installation and integration activities.
  • Monitor battery system installation.
  • Verify Battery Management System (BMS) integration.
  • Coordinate electrical and control-system interfaces.
  • Supervise and verify battery fire-safety systems.
  • Monitor testing and commissioning.
  • Witness functional and performance testing.
  • Review technical documentation and test procedures.
  • Support resolution of BESS integration issues.
  • Coordinate with electrical, commissioning and HSE teams.
  • Support final acceptance and handover.

Profile

Candidate Requirements

  • Bachelor's degree in Electrical Engineering or closely related discipline.
  • Minimum 8 years of relevant engineering experience.
  • Proven BESS design, integration and commissioning experience.
  • Strong understanding of BMS architecture and interfaces.
  • Experience with utility-scale battery systems.
  • Knowledge of battery safety and fire-protection systems.
  • Strong commissioning and performance-testing experience.

The requested profile requires 8+ years with BESS integration/commissioning and responsibility for BMS, fire safety and performance testing